Data center handling solutions
Plan the handoffs between receiving, rack transport, and server installation.
Receiving loaded racks
- Loaded rack
- Record the loaded weight, base dimensions and caster layout before booking the move.
- Rack handoff
- Ask the rack manufacturer how to remove the rack from the pallet and which attachment points are approved.
- Dock approach
- Include the loading-dock approach, any ramp and the first door on the route in your site measurements.
Transport between rooms and aisles
Measure the full route
Measure door openings, turning space and thresholds with the rack and tug coupled. Check gradient, floor capacity and elevator limits along the entire route.
Verify a loaded demo
Ask for a loaded demo covering forward and reverse travel, turns and stopping with the proposed rack attachment.
Server and GPU installation
Browse server liftsMeasure the heaviest chassis and locate its center of gravity. Record the highest rail position and the direction the server slides in.