Data center handling solutions

Plan the handoffs between receiving, rack transport, and server installation.

A clear transport aisle between rows of server cabinets

Receiving loaded racks

Loaded rack
Record the loaded weight, base dimensions and caster layout before booking the move.
Rack handoff
Ask the rack manufacturer how to remove the rack from the pallet and which attachment points are approved.
Dock approach
Include the loading-dock approach, any ramp and the first door on the route in your site measurements.
RT-2000 coupled to a rack beside an open service doorway

Electric rack tug

View RT-2000

Transport between rooms and aisles

A row of server cabinets beside a clear walkway

Measure the full route

Measure door openings, turning space and thresholds with the rack and tug coupled. Check gradient, floor capacity and elevator limits along the entire route.

Verify a loaded demo

Ask for a loaded demo covering forward and reverse travel, turns and stopping with the proposed rack attachment.

Prepare a quote for RT-2000

Server and GPU installation

Browse server lifts

Measure the heaviest chassis and locate its center of gravity. Record the highest rail position and the direction the server slides in.

SL-200 product illustration

Slide the chassis onto the rails

Match the platform dimensions and lift range to the chassis and the highest rail.

AL-200 product illustration

Position equipment from the side

Check the space needed to swing the articulated arm into position.