Match chassis weight, rail height and platform reach to the installation.
Measure the chassis and rails
List the heaviest chassis, its dimensions and center of gravity. Record both the starting surface and the highest rail position so the lift can be checked at both ends of the transfer.
Check reach and insertion direction
A lift must align the chassis with the intended rails. Check the platform dimensions and insertion direction, and leave clearance for the lift base and operator.
Read the rating for the configured platform
For dual-level lifts, check whether the published rating is a combined load. Confirm load limits for the selected platform or attachment on the quote.
Share the rack model, caster layout, attachment points and loaded weight. If the route includes a slope or threshold, agree with the supplier on what can be demonstrated at that load and configuration.
During the demo
Ask the team to identify the bracket, restraints and load in use. Watch powered forward and reverse travel, a controlled turn and a stop.
After the demo
Record the load, floor and attachment used. Compare them with your own site conditions before confirming the configuration.